big fabrication up to 125 tons
Our customers increasingly desire the final assembly of machines and dies. Depending on definitions and customers, the
delivered machines are finished up to 80, 90 or 100 %.
This results in the following advantages:
- increased capacity: we take care of temporary peaks in order volume, so that our customers do not have to engage new personnel
- cost-reduction: we work in Czech at lower rates
- reduction of lead-time: as the manufacturer of the components, we can already start with assembly at a time before all parts are finished. The overlap of both processes results in a gain of lead-time.
- variable cost: our customers can now handle wages for assembly-personnel as a variable, which only has to be paid for existing orders. Thus fixed costs are reduced.
- Reduction of production facilities: some customers have ended their own assembly and now even save the cost for the assembly-building.
For our US-based customer MEGTEC we manufacture gas-fired emission burning furnaces:
- that weigh up to 80 tons
- with transport-heights of 4,90 meters and a width of 4,50 meters
- these furnaces and machines are welded steel structures
- with complete machining and final protocol of relevant values
- with final painting and certified paint thickness
- with inside & outside insulation and complete gas-train
- with large moving valves of in-house production
- with complete pneumatics and complete electrical wiring (several cabinets)
- with the buy-off procedure of the final customer in our facility, including level 3 tests with full burning power
- sometimes with field installation abroad by our own service personnel
- in hall 1 with 2 gantry cranes with 20 to and 10 to
- in hall 5 with 2 gantry cranes with 125 to and 40 to